On another note if you are designing the HVAC as well there are other things to take into consideration:
1 - Temp & Humid monitoring, (RA duct).
2 - Access points on BOTH sides of RF wave guides for future cleaning.
3 - All alum ductwork in Scan Room and critical placement of SA & RA depending...
I have extensive knowledge in all aspects of site planning for MRI, CT, Cath, Linac, etc. As for O2 Monitoring. #1 is that there is only one (1) approved unit, (must have a UL listing) and that's the Tox-Guard II. The unit must be placed in the Control Room and the sample tube run through an RF...