The walls are fixed in place, however, your idea of the compressed air is very intriguing. I will probably look into this idea. I think what it comes down to is making sure our release agent is applied correctly to aid in breaking the bond. Thanks for the suggestions, we will be pouring a test...
Gentlemen,
Have a question on the best option to remove an H-Beam stlye full concrete post from a prestress bed.
Stat's
Each post is tensioned to 31,000lbs (8 total cables) The dimensions of these posts are 12"x21" and up to 28' long. These posts are cast with the groove for the "H"...