Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. AztechLV

    7 day concrete breaks higher than 28 days?

    We have a concrete mix that we have been having problems with the 7 day breaks breaking higher than the 28 day breaks. The mix is a 6000psi mix with cement factor of 6.7 it uses admixtures of 322N, NC534, and Glenium. The cyliners are being cast and stored intially in temperature controlled cure...

Part and Inventory Search