Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. pdxdeacon

    "Pad Ready" Definition

    Hi, Can someone tell me if topsoil can be used as fill to make a site "pad ready". For example, if the "pad ready" elevation is supposed to be 100, can the subgrade be 99.5, and the top 6" be loose topsoil? Thanks, Kendra

Part and Inventory Search