Hello,
Our boilers consist of different parts.
Is the following situation allowed in ASME:
Entering part 1 of the boiler with water with an operating pressure of 2.5 barg - design pressure 3 bar.
Then entering an upper part 2 of the boiler with an operating pressure of 1.5 barg (= less than...