Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations Toost on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. prebellon

    SYNC CHECKING (machine rotating opposite to system)

    I witnessed a situation years ago - two of the leads (A and C) in a 10 MW machine were inadvertently swapped while replacing the 4.16 kV terminal cables. Two attempts were made to close the synchronizing breaker, causing the generator differential relay to trip instantaneously in each attempt...

Part and Inventory Search