I take care of the HVAC for my church in michigan and I am trying to find ways to figure out if it is cheaper to build ice with our 600 ton york chiller and burn it to cool the building or to just use the 550 york centrifical chiller to cool the building. I would like to hear your guys opinion...
thanks alot guys Ill post it in the hvac section but yeah we build ice on off peak times that fall between 10pm and 8 am. its a 600 ton screw and 550 centrifical.
Im new to this site but I ve already got lots of useful info on here. I am in charge of the HVAC area of a fairly large church and I am wanting to figure out if its cheaper to cool the building with my centrifical chiller or by building ice with the screw chiller and then burning it throughout...