  1. excon

    Cliff Reinforcement

    i had to deal with a similar problem, only difference it was a communication tower for cable&wireless, around 60 meters and it was about 2 meters from the edge.There was a land slide that made that edge a vertical cut. first , to keep all the underground water away from the cliff, we...
  2. excon

    river dike or deviation wall, how to calculate and what to consider

    I am studying how to deviate a river that has an average of 4 m/seg and 890 m3/seg . I want to construct a wall so the river will stay away from the place i want to work with minimun water level. I have been trying to get information on how to calculate the size of the wall that i want to...