Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. CivDevil

    Potential issues with Large Diameter Sewer, Low Design Flows?

    In the end I've required a switch out to 6", sticking with the known vs. the unknown. Project owner would definitely not thank us for saving a couple thousand bucks (potentially) if the sewer is clogging down the road. For this building, peak flows would have only occurred one day per week...
  2. CivDevil

    Potential issues with Large Diameter Sewer, Low Design Flows?

    I'm in the process of redesigning a sewer system for a small commercial project due to a utility conflict. Original intention was to extend a 10" public sewer main along street frontage and tap 6" service off of it for project; this has been scrubbed due to utility conflict blocking 10" main...
  3. CivDevil

    Health Insurance - Groups for Engineering Firms

    Thanks for the ideas. I'm with a company that I like but the benefits keep sliding down and down every year...trying to stabilize the tailspin and keep above water until the economy turns...though I may need to go join the army or something.
  4. CivDevil

    Health Insurance - Groups for Engineering Firms

    I work for a small engineering firm which is looking at going from a group plan to private insurance due to the ever-escalating costs of insurance and the economic slowdown. Given that my employer-based group plan is going away, are there other industry-based groups that I can ally myself...
  5. CivDevil

    Comparing 2-hr, 100-yr to 24-hr, 100-year storm

    Thanks for all the responses! I only wish my local agencies were as responsive. In response to RWF7437's question about bankfull capacities, I have run some simple Manning's calc's on the existing channels that show the current swales/washes to be incapable of conveying the indicated peak...
  6. CivDevil

    Comparing 2-hr, 100-yr to 24-hr, 100-year storm

    Question Background: I'm working on a rectangular parcel that is bounded on the north and west sides by existing washes. A regional drainage study (HEC-1) has defined the peak flows associated with a 24-hr, 100-yr storm for the area. The existing washes are not large enough to convey these...

Part and Inventory Search

Back
Top