Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: RORCULLO123
  • Order by date
  1. RORCULLO123

    Stress Relief and ASME Code

    metengr Sory, this is not i meant to be...it was my fault to connect this thread at the original post....i suppose to post my thread but accidentally posted at this forum. to tell you franckly, i am just a new member here. Anyway, thank you for valuable response/advice.....
  2. RORCULLO123

    Busted steam check valve of pressur

    Busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  3. RORCULLO123

    Stress Relief and ASME Code

    Busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  4. RORCULLO123

    REFRIGERATION-CHILLER

    Busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  5. RORCULLO123

    REFRIGERATION-CHILLER

    busted steam check valve of pressure boiler drum.... Our company has 4 coal fired boiler and two fuel fired boiler. We are required to maintain 1 MPa to maintain the production operate in a good condition.we operate 2 boler at a time to avail these requirement.the connection of the two boiler...
  6. RORCULLO123

    REFRIGERATION-CHILLER

    thanks to your valuable reply.... By day the previous design datas and condition written below are as follows; 100 TOR, 95 kw rated compressor power,90 KW compressor power required, 18 bars operating pressure and 658 m3/h swept volume and water cooled... ... and the present/redesign data: 100...
  7. RORCULLO123

    REFRIGERATION-CHILLER

    REFRIGERATION-CHILLER I am a begginer Mechanical/design Engineer.... As of now construction of our rehab chiller is still going on. Some technical says that our compressor will possibly worn-out because that reciprocating compressor use a ammonia refrigerant and my design is use Freon 22 instead...

Part and Inventory Search