  1. gwelch123

    What is a typical valve train after leaving the LACT unit.

    I have a typical 4" flange leaving the LACT Unit and would like to know what the typical valve train set up will be after the flange.
  2. gwelch123

    P&ID As-Builts and Drafting the redlined

    I started my company about a month ago and I am now offered some great clients to bid on. I figure rates for an engineer to walk down a P&ID and redline it to reflect whats actually there and then draft. $90 to $125hr for walking and redlining am I correct or is this to low or high? Drafting the...
  3. gwelch123

    What are the minimal NDE requirements of API 1104?

    What are the minimal NDE requirements of API 1104? RT, VT, etc..
  4. gwelch123

    Minimum API 1104 NDE requirements?

    What is the minimum API 1104 NDE requirements? RT, VT, PT etc..
  5. gwelch123

    Quality Awards

    Are there any organazations that award companies for Quality? if so who are they? We are ISO 9001:2000. I have yet to find a place that has quality awards..
  6. gwelch123

    Welding Titanium

    What steps are needed to weld Titanium? I was told this statement "Titanium should be welded in a clean room environment, which we do not presently have. Any breeze, contamination or poor gas mixture will cause an undesirable coloration. Not saying it can't be done but it may prove to be...
  7. gwelch123

    Welding over porosity

    We are building a API 650 tank and the production guys are welding over porosity saying it's ok and it will burn out. What does the code say about this or if not what can happen by doing this? They are also gouging the backside and then with all the nonfusion present after gouging they are...
  8. gwelch123

    Welding over porosity

    We are building a API 650 tank and the production guys are welding over porosity saying it's ok and it will burn out. What does the code say about this or if not what can happen by doing this? They are also gouging the backside and then with all the nonfusion present after gouging they are...
  9. gwelch123

    Normal Fluid Service and Severe Service

    B31.3 here....Okay so if you are postweld heat treating pipe (carbon steel) and 100 % RT after PWHT shouldn't the X-ray tech automatic assume it's graded severe? I mean any 100% RT and PWHT is automatic graded sever on X-ray right? Again please let me know where I can find the answer
  10. gwelch123

    Normal Fluid Service and Severe Service

    We are doing the required 5% RT on Normal Fluid service and we also have Class I Fluid Service with 100% RT. My question is does the 100% RT go toward the 5% on normal or is it separate? I have conflicting answers on this subject. Thanks
  11. gwelch123

    HELP!!! Is it required to X-Ray after PWHT in SEC VIII and where found

    HELP!!! Is it required to X-Ray after PWHT in SEC VIII and where is it found in the Code? This is on a pressure vessel. Please help me ASAP thank you Greg