Hello All,
I recently started working in a Process Plant which utilizes steam from geothermal brine to generate electricity.
7 Mlbs/hr of brine enters the High Pressure Separator at 340F, 315psia through a 36"line. The vessel has vortex cluster internals to increase the brine/steam separation...
I agree with maddocks. Are you developing a FEED (Front End Engineering Design) Package or doing the detailed design as well?
All responses above are useful in doing FEED/ Conceptual Study but please consider using an Engineering firm for detailed design.Your company can look at doing the...
After the Pigging Operation is completed, the line will be filled with either the process fluid, water, inert gas etc.
The piping configuration on the Launcher Skid if properly valved will prevent any entry of air.
I do not see how air re-enters the system unless your pump is cavitating - in...