Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. dorinad

    P 100 - Values for Response Spectrum analysis

    problem solved. just in case, if someone wants to know: for Romania, ag=0.16 G, reinf. concrete building, ductility factor 4.725 the starting value for design spectrum is 1.6 m/s2 at T=0, with 0.9 m/s2 between 0.07 and 0.07 seconds. scale factor "1" for N m units
  2. dorinad

    P 100 - Values for Response Spectrum analysis

    Can somebody help me with some values for the Scale factor in the definition of the response spectrum ? Especially for the definition of romanian p100 - 2006 seismic code (or EC8). When defining a response function in etabs / sap2000 the values for the accelerations represent fractions of G...

Part and Inventory Search