Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: anglo
  • Order by date
  1. anglo

    Gas drying - glycol consumption

    For a 300 MMPCD we use a 60 GPM of TEG at the contactor column and spend 12000 lb per month
  2. anglo

    TEG dehydration

    I am currently designing two dehydration plants, using Hysys in order to simulate it. Also using for references GPSA 11th edition. Regards, anglo
Back
Top