Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. divingunder

    Primary Outlet Device--Culvert

    I am modeling a detention pond with a 12" culvert as my primary outlet (discharge pipe). After routing, my results show a discharge above the capacity of my pipe. I have a 12" ADS pipe with a .5% slope. Modeled discharge is 4.78cfs and the full discharge of that pipe is approx 2.5 cfs. I am...

Part and Inventory Search