Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Andre7

    Dredging to lay intake pipe into the sea

    I am doing an estimate to install a water intake pipe about 3/4 mile into the sea. The sea has a slope from shore line to about 25 feet deep 3/4 mile from the shore. The excavation needs to be about 22 feet deep at the shore line and will follow the slope of the sea floor. The geotechnical...
Back
Top