Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: JCSR
  • Order by date
  1. JCSR

    Differences between the API-546 and the Nema MG-1

    We are in the process to select two Diesel Generators 2.5 MW, and would like to know what differences are between a generator API-546 and one Nema MG-1. Essentially, I know that the API-546 test section is more complex than the one at Nema MG-1, but not sure about the area classification and...
  2. JCSR

    Control Room, and the minimum number of doors (ACCESS)

    The control room is 39' x 19'. I already looked at the OSHA OTM, but I have not seen the information. Also looked at the NFPA 70, 70E, and from the electrical point of view, I did not find any regulation for the minimum number of doors for a control room. Could you please point out any...
  3. JCSR

    Control Room, and the minimum number of doors (ACCESS)

    We are designing a new Centro control Building at a Refinery. I would like to know if is there any Standard for the minimum number of doors (access) for a Control Room. Thanks.
  4. JCSR

    Power Electric Network Reliability Calculator

    Hello, I am looking for a free Software or Spreadsheet for Power Electric Network Reliability Calculations. I know about the Enrico software, but now I have not access to it. I appreciate any suggestion or comments. Thanks. JCS.
  5. JCSR

    Electric Load Report

    Hello, I am working in a Refinery’s control room and I am looking for a standard or guideline reference for a Formal Electric Load Report, usually I have done that in an Excel Table, but this time I would like to see if I can improve that. Somebody has any idea or suggestion. Thanks
Back
Top