Thanks for the responses so far. Some more information:
The source is a city main which is pumped up from ground level to the pump on the 30th floor. So two pumps in series.
The size of the pump will likely be 500 gpm.
There are 55 storeys in the building.
Pump is feeding a standpipe which...
Hello,
I am hoping for some design assistance on a new construction project that involves a fire pump located on the 30th storey. My questions are as follows:
1) Where should the test header be located?
2) How should it be drained?
Thanks,
Ryan