Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. cssmach

    Replacement of Economiser

    How to calculate steam source requirement?
  2. cssmach

    Replacement of Economiser

    correction : each coil of 12mt length with 24bends ( total length of coil 288mt)
  3. cssmach

    Replacement of Economiser

    Thank you all for the discussion. Perfect cleaning is interesting but steam blowing with inadequate pressure and velocity can cause chemical corrosion due to the condensation and trapped debris if any. I feel sufficient airblowing and chemical flushing at 0.5pH will be better and effective...
  4. cssmach

    Replacement of Economiser

    What are the disadvantages, if we don't see in borescope and resort to steam blowing?
  5. cssmach

    Replacement of Economiser

    Does steam blowing add any value
  6. cssmach

    Replacement of Economiser

    We have been planning replacement of complete economizer banks in 500MW boiler of 25 years old. We planned sponge ball testing for thoroughness check of new coils before welding. Chemical flushing ( DM filling and ammonia dosing for up to 9.5 pH)of new banks after complete erection. Please...
  7. cssmach

    Suggest best connectivity at 415V swgr in the diagram

    100kW Solar PV system Connectivity is proposed as shown in the diagram. Grid Connectivity to a module with 200 Amps fuses at 415 v Swgr (at 'B') is proposed. 415 V MCC is highly important swgr located in a power plant. The question is what can be the best way of connectivity at 'B' so that any...

Part and Inventory Search