Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. gtfriday

    Drawing Number vs Part Number

    Yes, the existing PLM tool will be kept in place. Actually all of the data in on the one PLM now. The problems we are starting to see is that in one case the user sees a drawing as an attachment to the part (part number = drawing number0 and in the other case the user needs to go one level...
  2. gtfriday

    Agile PLM software

    We have been using Agile PLM for several years and are quite happy with it. We are using it for ALL drawing, specification and BOM work at 3 locations through the world. The system has been working great with little or no down time and does not require a lot of IT support. Agile starts the...
  3. gtfriday

    Drawing Number vs Part Number

    We are in the middle of combining two companies into one and need to standardize a few things. One major issue is at one location the Part Number and the Drawing Number are one in the same. At the other location we have a number for the Part and a separate number for the Drawing. In the first...
Back
Top