Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Dudesa

    Misalignment Fit up Head to Shell in a boiler

    Thanks for your support, For your info A transition weld will be done by SAW on the inside and outside. regards
  2. Dudesa

    Misalignment Fit up Head to Shell in a boiler

    The welding will take place next week with a "transition weld" on the inside and then outside part by SAW. For shell part the design pressure about 800psi and Temperature 550F. thanks
  3. Dudesa

    Misalignment Fit up Head to Shell in a boiler

    gr2vessels, thank for this quick answer, you are right I mixed up with alignment it is mmore an offset. I attached a sketch of it. http://files.engineering.com/getfile.aspx?folder=b4576ce7-2c14-4cb4-b95f-37bb330fee30&file=Fit_Head-Shell.jpg
  4. Dudesa

    Misalignment Fit up Head to Shell in a boiler

    Hi All, I have an issue on a fit up of a flat head (tubesheet) with the shell. head & shell th 45mm ID 2000mm in order to keep final lenght due to an error on nozzle fit up the head have been reduced in hight (smaller diameter) and i have now a misalignment of about 15 mm all...

Part and Inventory Search