Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. saadicarnot

    Justification for use of higher GPR value

    Due to high resistivity value I am not able to reduce the grid resistance. Although my touch and step potentials are within limits still GPR value is higher than specified value of 5kV. I need to convince my client that GPR of 7.8 kV is a safe value. I have tried arguing on the point that as...
  2. saadicarnot

    cable ampacity in ductbanks

    Hi, I have following questions for cable sizing laid in ductbanks: Whether to consider soil temperature or ambient air temperature while calculation of cable ampacities in ductbanks? Further how to consider small air gap in ducts carrying cables ? Thanks.
  3. saadicarnot

    Unbalance delta load connected to star source

    Dear Skogsgurra Can you suggest some reading material on this topic ? Thanks.
  4. saadicarnot

    Unbalance delta load connected to star source

    Hi, I want to know the implications of connecting unbalanced delta load to secondary (Star Winding) of transformer. Thanks.
  5. saadicarnot

    Need comparison between CDEGS and WinIGS

    Hi Fellows, We are currently using CDEGS software package for grounding system design an analysis. From one of IEEE surveys I found that WinIGS is also very popular these days but I am unable to get my hands on the demo version of the same for evaluation purpose. It would be nice if some one...
  6. saadicarnot

    Use of SPDs in substations

    If all the equipment, metallic objects and cable shields are properly bonded and connected to the main earthing mesh and the air termination system is designed properly. Then, is there a requirement for SPD (surge protection device) in the control building? If yes, then kindly give some...
  7. saadicarnot

    Soil model with out intended resistivity values

    Yep I know that and that is the main problem that even after backfill the values will not be very accurate and because of this the system will be over designed. Normally it is not a big problem to over design but you see cost cuts are desired in recession. Thanks.
  8. saadicarnot

    Soil model with out intended resistivity values

    The site is excavated till a level of 10 meter, so don’t you think that a two layer soil model be used instead of three layer one. Thanks.
  9. saadicarnot

    Soil model with out intended resistivity values

    Normally as most earthing design practitioners take the resistivity values before excavating for the earthing mash. But in our case the site is already excavated for the said purpose and the resistivity data is available further bellow that level. So can any one recommend a technique which we...
  10. saadicarnot

    How to calculate ground temperature from ambient temperature?

    Thanks a lot CarlB. It was very helpful. Thanks.
  11. saadicarnot

    How to calculate ground temperature from ambient temperature?

    Dear escrowe. I have taken the civil boring data from project managment and I am only concerned for 1.2m depth. As you have mentioned that it is possible to have an estimate by having information of grain size and moisture content, so can you refer to some reference material? Thanks. CarlB...
  12. saadicarnot

    How to calculate ground temperature from ambient temperature?

    Is there any methodology by which one can calculate ground temperature from air/ambient temperature? I want to calculate de-rating factors for cable current carrying capacity but the project specifications don’t give any information about ground temperature.
Back
Top