It will be of great help to me if you kindly let me know the basic design criteria of stress analysis of cryogenic piping (LNG) subjected to -160 deg c. Further is there any special code requirements are to be considered.
Thanking you in advance for the help.
Considering a 3-level Pipe Rack, Lines shall be placed in the preferred locations conforming to the following.
1. Largest and Heaviest lines to the Outside.
2. Group Steam and Condensate lines on top tier with largest and hottest at rack edge.
3.Large bore cooling water lines on bottom level ,at...