I am installing a truss bridge in Montana and I am trying to find a design for an abutment that doesn't have piling, just a spread footer.
The bridge is 75' long and spans the high water mark by 12' on either side so I shouldn't have any scouring.
The soil is rocky but not bedrock.
I need to...