Hello, I'm not a mechanical engineer so forgive the low level of this question. I'm reading through the proposed changes in the new LEED 2009 (NC) Rating System. For EQ Credit 1 (Outdoor Air Delivery Monitoring), the requirements have changed. Actually a part was added.
Here is the old text...