  1. Elec17

    Zoning for Methanol

    Cheers all. yea my feeling was that ex fitting would be overkill in the situation in question.
  2. Elec17

    Zoning for Methanol

    I'm an electrical engineer and have been asked a question because I've had some involvement with explosive atmospheres (ie vapours and dusts possibly igniting because of a spark or other heat source). Somone is importing and storing about 12 by 5 litre (About 60 Litre total or about 16 US...
  3. Elec17

    Protective Multiple earthing

    Thanks all.Much obliged. Have exactly what I need from your answers. I am also tryin to get hold of BS 6907 as recommended to be fully armed.
  4. Elec17

    Protective Multiple earthing

    I have been asked to justify my recommendation that protective multiple earthing (PME) should not be used in a quarry environment. My initial justification is that differnet items in a quarry could be in close proximity (2 conveyors for example) but with different earths causing a potential...
  5. Elec17

    Practical Book on RElectrical enginnering

    I'm looking for a comprehensive readable book on electrical engineering. I work in safety, so it would need to cover all bases without going too far into formulas etc. I thought I saw that McGraw Hill published exactly what I was looking for but I couldn't find it when I went searching the web...
  6. Elec17

    Quarry Electrical Safety

    Many thanks for helpful answers. Question for Maramite. Do you know why the HSE dropped their 1990 Code of Practice to replace them with the 2008 Guidelines shown above? Qustion for Zogzog-I hear FOP tests can be difficult and there are other grounding tests that could be used. Any info?
  7. Elec17

    Quarry Electrical Safety

    I'm in the process of preparing guidelines to the quarrying industry on electrical issues. Has anyone any general experience of quarry electrical safety that's peculiar to that industry and should be covered?