Guys,
I'm a mechanical engineer, with very limited knowledge on soil. i have to design a structure for pipeline crossing on a VERY SOFT CLAY.
Problem is, from survey report there is no Su recorded in the bore holes. going downstrem to the next bore holes, there is an Su recorded, at 0.7m...
All,
I'm a pipeline engineer. very new actually. forgive me if my english is not good, as english is not my first language.
i need your help on designing reinforced wye. initially our client wants us to design a fabricated, reinforced tee with 12" pipe welded to a 24" pipe. I've looked into...
Pennpiper,
It should be option A. it is a cleaning pig, therefore once it goes into the 24", it will be "pigged" by another pig from 24" all the way to the end (i guess the client can afford to lose one pig).
All,
I'm a pipeline engineer. very new actually. forgive me if my english is not good, as english is not my first language.
i need your help on designing reinforced wye. initially our client wants us to design a fabricated, reinforced tee with 12" pipe welded to a 24" pipe. I've looked into...