Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. gA2002

    Hydro testing branch spool against run pipe external

    @XL83NL: the olet is part of the new spool, complying to B31.1, so it needs to be hydro tested as well.
  2. gA2002

    Hydro testing branch spool against run pipe external

    @SNORGY - Thanks for the inch of confidence! @XL83NL - Thanks for the thought. To hydro test before cutting of hole is to test the olet welding. No way of hydro testing with the main pipe. I am safe external pressure in order not to collapse the main pipe area enclosed by the olet. 304.1.3...
  3. gA2002

    Hydro testing branch spool against run pipe external

    Hi everyone! Has anyone did hydro-testing of branch spool welded to the run pipe with weld-o-let, before cutting the hole from the main pipe? Let me explain further: 1) 3" weld-o-let to be welded to a 10" run pipe. 2) Weld neck flange is welded to the weld-o-let. A valve will be fitted to the...
  4. gA2002

    Process Plant in Sub-Arctic Location

    Thank you for your responses, they are all warming and thawing away the frost! TBP: Yes, the minimum ambient temp. can be -34 deg C (-93.2 deg F). Chris/MintJulep: I did consider the heat losses from the installed equipment and from the ore processing. I based the ACH to the least I can get...
  5. gA2002

    Process Plant in Sub-Arctic Location

    Good day fellows, I am currently involve in the engineering of an ore processing plant located in a sub-arctic region where the min/max temperature is -20/20C and the mean ambient year round is -1.7C. With chill factor, the ambient drops to -34C (as it was a couple of days back when I check...
  6. gA2002

    ASME B31.1 - 319.4 Flexibility Analysis

    Thanks DSB123, appreciated.
  7. gA2002

    ASME B31.1 - 319.4 Flexibility Analysis

    The projections between two anchors being considered are: x=2363 mm y=3226 mm z=1488 mm This comes out after algebraically adding all the piping segments on the pipe spool roll being considered, done for each corresponding axis. I simply assumed that U = SQRT(x^2+y^2+z^2)= 4227 mm To be use...
  8. gA2002

    ASME B31.1 - 319.4 Flexibility Analysis

    thread292-246231 I am not sure whether I have determined the correct anchor distance U in my calculations to check the requirement for Flexibility Analysis as per 319.4. Question: In determining U (straight line distance from anchor to anchor), does it mean the diagonal distance between...

Part and Inventory Search