Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Draper1

    unwashed waste lines

    The question is not what you are answering. I did mistype the information, as the grey water does go to a maceator, but forget about the jurisdiction, etc. This is an industrial application with special circumstances. The question is on the long unwashed horizontal grey lines going to the...
  2. Draper1

    unwashed waste lines

    Gray water is drainage from floor drains, and sinks. Cleanouts connected to storm. IPC I also need to ask the problem with unwashed sanitary cleanouts.
  3. Draper1

    unwashed waste lines

    Could someone tell me why there is a problem with long, "unwashed" horizontal gray water lines going to a cleanout in a wall?
  4. Draper1

    Class 1 Division 2 Group C & D electric water heater

    I have found one manufacturer that makes explosion resistant Class 1 Division 2 Group C & D electric water heaters in the 1000 gallon storage tank size, Hubbell. Is there another? I cannot find any.
Back
Top