    substation transformer

    If you are seriously concerned, you could do a full-load heat run. Load the unit (with resistor banks, if necessary) to 2500 kva and run until oil and winding temperatures stabilize for at least 30 minutes. If you can do this without exceeding the design temperature limits for oil and winding...