Hello !
I am an electrical engineer working in a cement factory.
We have a power plant installation of 3 x 8 MW.
I am facing a problem with the unbalanced voltage.
We are using PT's for measuring voltage (6 / 0.1 KV).
This PT have two secondary windings. First one is wye connection and there is...