Yes, the package shall be certified by ABS (if i understand correctly, ABS shall certify the whole FPSO, we have to get the "declaration to confirmity for our package, it will help end-client to get the BAS certification).
Micalbrch,
mentioned in certificate std: EN 50018 (Withdrawn in 2000); EN 50014 withdrawn, superseded by EN 60079-0.
I have read that it is responsobility to keep the certification of product updated, even if std was superseded by other, manufacturer has to arrange product's certificate in...
Dear experts
Please, give your feedback to following:
- offshore, control panel, controller is inside this panel;
- control panel is actually very big jb;
- controller has the certificate with listed standards, which are not active any more (EN);
- assemblier of this panel tells, that this...
Dear specialists
Please, correct/comment following:
"To comply to BS En 600079-10 Electrical Apparatus for Explosive Gas Atmospheres, cable entries to the junction boxes and cable glands shall be metric (not imperial units of measurement."
Thanks in advans
zh003
Hello
We have in the project motor operated valves which are interlocked with pumps, compressors. They have to be closed in case of fire. Fluid is flammable and toxic. We have 3 pushbuttons ”Stop”- on the actuator, on the panel somewhere on the field, on the pump/compressor panel.
Please advise...
Hi, everybody
Today i had discussion with colleagues about DCS and ESD. They would like to use one (common) field junction box and then multipar cable and marshalling panel for DCS and ESD systems without any separation.
Could you please give me the stds numbers to study this issue. Previously...