Hello SAP2000 colleagues,
I have a casted-casted 10m length beam. I created joints in the position 0,2,4,6,8 and 10m , then I created 5 frames (2 m. length each) connecting these joints with a IPE 270 cross section. After this I assign loads to the joints. I am designing with AISC and would...