Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Jackster

    Starting HGL

    I have a pipe system entering a wet pond at the invert of the pond. Routing the 10 year storm through the pond the 10-yr WSE is 1 foot above the permanent pool elevation. Would my starting HGL be the permanent pool elevation or the 10-yr water surface elevation Thanks, Jack

Part and Inventory Search