JAE - Thanks for the quick reply.
Yes, we are responsible for the seismic stability of the equipment itself. We basically ensure that it won't break apart during a seismic activity. The building engineer is responsible for the connection details, though we have given recommendations in the...
My company designs and manufactures large pieces of equipment (~10-30 tons) that sometimes are sold into seismic zones. I'm trying to write a procedure to document the expectations of all parties to be discussed at time of quotation. Since we don't design the buildings that these pieces of...