Thanks. I think you are understanding the situation. The strut would be welded to the wale, and then on the other end, the strut would be welded to a vertical brace pile just above the ground. I think the whole connection type is the big question..is it pinned, fixed, etc. We have done...
We are designing a single line vertical wall shoring system using PZ-22 shoring with two levels of wales and struts. Due to the orientation of the excavation and proposed footing, we have to angle the struts away from the 90 degree orientation in the horizontal direction. We were also...