Thanks. I'll check it out. Our specification does have the 30 degree offset on the pipe's principal axis. I am trying to find a reason to even have separation. Since this varies by area, the stress load is not generally known until the files are examined; therefore, general default rules apply.
Does anyone have any specific knowledge of where ASME B31.3 addresses the alignment of the weld seam on Electric Resistance Welded (ERW) pipe? Our construction folks seem to want to align the weld seam from pipe section to pipe section at a butt weld.