  1. zozo21

    Problem on DGS for H2 Recycle Gas Compressor

    1-In the original design, the source of pure hydrogen for start-up and shutdown was from cylinders at 110 bar and to draw from 110 to 15 bar some modifications were necessary to do. Until now we have not done. 2- The startup procedure, is as your describtion. 3- The switch from N2 to H2 is...
  2. zozo21

    Problem on DGS for H2 Recycle Gas Compressor

    Agree with you because in the initial design the gas seal start-up and shutdown was Hydrogen (82% H2 purity) at 15 kg/cm2G and for unknown reasons they changed to the N2. Following chart, which simply shows, different operating modes of the compressor, in order to ensure availability of external...
  3. zozo21

    Problem on DGS for H2 Recycle Gas Compressor

    the leakage is in the both side DGS's (ND and NDE side). settle out pressure = 12 kg/cm2G startup N2 pressure = 6,5 kg/cm2G
  4. zozo21

    Problem on DGS for H2 Recycle Gas Compressor

    I try to give you more details - Seal arrangement: Tandem with int labyrinth / bidirectional. - Driver type : steam turbine with slow roll condition - For primary seal, we use N2 for startup and shutdown, and H2 from 2 nd stage of compressor in normal operation. - For secondary seal, we use...
  5. zozo21

    Problem on DGS for H2 Recycle Gas Compressor

    Hi everybody; Please help us; we have a new (03 years old) H2 recycle gas compressor for reforming unit equipped with dry gas seals (DGS). For 3 times, when we shut down the plant and we restart again, the DGS fail (high pressure in the primary vent) it mean the primary seal is failed, so, we...