  1. 1hammer

    Power Piping Code Gas Piping

    We install new heating boilers for hospitals,schools,etc... We install sectional boilers, and packaged boilers (Cleaver Brooks, Columbia etc...) I was always told piping after the first valve off the boiler, you don't have to be certified. Also, we do install gas piping (natural and LP) for...
  2. 1hammer

    Power Piping Code Gas Piping

    Our company has welders with certifications per AWS Code. We have seen in the new specifications that qualified welding procedures ,welders and operators in accordance with ASME B31.1, or ASME B31.9 as applicable, for shop and project site welding of piping work. We work on schools and...
  3. 1hammer

    ASME CODE STAMPS REQUIRED

    To assemble a cast iron sectional boiler, is a ASME stamp required. What is an A stamp ( Assembly of Power Boiler) used for.
  4. 1hammer

    Assembly of a cast iron boiler ( Weil McLain, H.B. Smith etc)

    Do you need a ASME H Stamp to assemble a cast iron boiler.