Thank you both for the valuable information. This lift station will actually be a Master Lift Station, with peak flows of about 1100 gpm. Your input is appreciated.
I am working on a Master Lift Station design and wish to know if there are minimum design standards for the lift station float elevations - alarm on, lag pump, lead pump, pumps off, etc. Can anyone recommend a design reference also. Thanks in advance for the information.