Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. zomg11one

    Vapor Recovery Tower Design

    I'm looking for some guidance on Vapor Recovery Towers (VRT). Currently we have condensate and water (at a compressor station) flowing into two storage tanks that flash causing vapors that are vented to atmosphere. We are installing a VRU with a VRT to recover these vapors. 1. Does anyone have...
  2. zomg11one

    How to talk about PSV experience on a resume

    I suppose i should be more specific. The challenge with employers that I'm anticipating is that they see that all I've done is PSVs. In doing these calculations there are so many aspects of a facility that are looked at and evaluated -- you get pretty deep into pumps, compressors, control...
  3. zomg11one

    How to talk about PSV experience on a resume

    I just finished my 2nd year as a process engineer at an EPC company. Most of the work I've done has been PSVs -- sizing, rating, tedious calculations, etc. How should one discuss PSVs on a resume? I'd like to avoid saying "Sized 80 PSVs at *insert plant name here*. Rated 200 PSVs at *insert...
  4. zomg11one

    Need equation for sizing a blower motor

    We've got an enclosed flare that is sized to vent 44.62 MMSCFD of syngas. GPSA says 3-7 lb of air should be used for smokeless operations; this means we've got to move air at 100,157 ACFM. That being said, is there a handy equation for finding the horsepower of the electric motor used in the...

Part and Inventory Search