Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. netknight

    Drought condition impact on new concrete slab

    Yes, we have gone from one extreme to the other. It has put my project at least 3 months behind with rain and mud. We havn't seen any signs of stress or problems with the foundation during this extreme re-hydration of the soil. I'm guessing that if there were issues, we would have seen it by...
  2. netknight

    Drought condition impact on new slab

    We are experiencing a drought condition in Dallas that has left the area without rain for 60+ days. I am about start construction on a large home that will be on a "engineered" post tensioned slab on piers. The soil is black clay and I am concerned about the possibility of heaving...
  3. netknight

    Drought condition impact on new concrete slab

    We are experiencing a drought condition in Dallas that has left the area without rain for 60+ days. I am about start construction on a large home that will be on a "engineered" post tensioned slab on piers. The soil is black clay and I am concerned about the possibility of heaving...

Part and Inventory Search