  1. Naif1981

    flow coefficient for braided stainless steel flex hose

    try to get all the data you need from the manufacture, I had the same case before and the hoses were from USHOSE
  2. Naif1981

    Hydrotest Requirement per ASME B31.1

    ASME b31.3 345.2.2 other test requirements a)examination for leaks. A leak test shall be maintain for at least 10 min. and all joints and connections should be examined for leaks. and this is a minimum time if you want to increase as ak1956 for 30 min it is ok for me I preffer 1 hr min
  3. Naif1981

    TOFD

    All of u. Thanks now I am trying to see our consultant and replay to u.
  4. Naif1981

    TOFD

    Hi gr2vessels Thank u, first, i am not from India, I am from Saudi Arabia, and the reason I asked for TOFD and UT, RT, cause I am involved in a big Project In mounded tank with capacity of 4000 m3 (10 Nos) and some bidders suggest the TOFD instead of UT,RT also our consultant recommend this...
  5. Naif1981

    ASME b31.3 and AWS 1-1

    Thanks Biginch, What i understand is even the contractor follow procedure of welding as per the codes i will get a defected weld but within 5% of total welded points? What about 80% failure I think if I got a 80% failure ? i am sure the contractor not follow the codes right?
  6. Naif1981

    TOFD

    Thank u all What about RT only instead of TOFD or UT?
  7. Naif1981

    TOFD

    Hi If u have 2 choose between TOFD (wich is now approved by ASME codes) and normal RT or UT which one u will choose? 4000 m3 vessel (cylindrical-mounded for LPG) does any one choose TOFD before?
  8. Naif1981

    Working Pressure

    sowhatso, i advise U to start with calculation for this problem and tell us what u got. Do not trust the supplier, do u have an engineering dept.?
  9. Naif1981

    ASME b31.3 and AWS 1-1

    Hi gents let us say that i am preparing a contractual documents, and the list of scope of work. one of the list Items is welding I wrote: Welding of all pipes connection as per ASME B31.3 and AWS 1-1. my question is: 1 st: Is the contractor must do the welding including NDE either (UT, RT) (I...
  10. Naif1981

    mild steel flange with carbon steel flange

    thank you all, I have already ask the supplier to check and the flange will be replace. but I need clarification regarding join of 2 difference material flange, Is it accepted by ASME B31.3? regards
  11. Naif1981

    mild steel flange with carbon steel flange

    Hi The flexible hose we have ordered came with flanged connection as per our requirement. but I found the flange material is mild steel ASA 300 while we asked for carbon steel flange material A 105 class 300 what i know is mild steel has low carbon content and is more malleable and it is not...