thanks big my point too. I did put in by-pass to the tank
the tank but the engineer that has to approved it say that the orrficep plate will reduce the pressure but what about that excess flow. the relief valve is only 1/2 inch. i dont understand his logic behind this.there will be heat built...
okey then. here is the problem. It is for jet a1 and avgas pump station.we want a drum filling area. the problem is the we have to reduce the pressure and flowarate from 60 m3/hr to 4.2m3/hr. can one run the pump at this flowrate of 60 waht will happen to the excess fuel if only have 1/2 inch...