so should the bidder follow the spec (several pages long and very detailed) or should the bidder follow the single page equipment schedule?
if the equipment schedule serves as the basis to select equipment, then what is the full spec for?
For an Engineering Project, what is the purpose of Equipment Schedules?
I understand that the specs are a detailed description and listing of equipment characteristics, performance, materials, etc. that the installer will bid on.
So what is the Equipment Schedule used for?
Are Equipment...
For an MEP type job, what is the purpose of Schedules?
I understand that the specs are a detailed description and listing of what the installer will bid on.
So what is the Equipment Schedule used for?
Are they the same thing? If not, what is the difference?