Hey all, thanks for the answers so far.
The system is currently already constructed as stated and we are preparing to assist the manufacturer commission it within the next week. I am wondering how to calculate whether the current system will work as installed or if there will not even be water...
Hello bimr, let me clarify please. This is being constructed by an EPC at a new facility.
1. Great question and one we are asking now. It does not seem correct to us that the sample would come off the top of the pipe at the absolute high point in the system, rather than lower down where it is...
Hello all,
I have encountered a situation to which I am not sure what equations apply.
I have a pump discharging to a 4" stainless pipe with several elbows to the top of a tank which is vented atmospheric pressure, and provides suctions to other pumps in downstream processes.
The construction...
Hello,
I am a chemical engineer who obtained a job out of college in the utility industry. I work at a power plant with 6 large heat-recovery steam generators (HRSG, aka boilers on the back end of combustion turbines). I am a maintenance planner here.
Frequently I need to create work packages...