  1. barlow12358

    Pipeline, supports, buried pipe, Error

    In a pipeline of 28 km, to pass a buried pipe gives me the following error: "Too many soild supports needed for the model. Please break the model down and use the large include" How can you do to separate the model number and perform a single analysis? thanks for the help
  2. barlow12358

    How to define mainline block valves by B31.4

    hello The ASME B31.4 does not indicate anything about how to define a major river. In my experience should consider environmental factors, response times to an incident. Rios over 15 meters and its main tributaries distances greater than 1000 meters should have block valves and systems for...
  3. barlow12358

    Pipelines and valve stations

    Good day, I am working in the early stages of engineering that consists of two pipelines (API 42 º and 16 º) of approximately 500 km. I have previously worked with pipelines (gas) in engineering detail. I have three questions regarding the design in its early stages: 1. The design of the pipe...