Hello to everybody
I've a project regarding instalation of switcgears in high altitudse up to 4000m.
The instalation is regarding a switcgear box for controlling a diesel generator 500kW 3x400V at 50Hz, with have two sections, one section for main current and one section for controlling of...
Hello to everybady
I've a project regarding instalation of switcgears in high altitudse up to 4000m.
The instalation is regarding a switcgear box for controlling a diesel generator 500kW 3x400V at 50Hz, with have two sections, one section for main current and one section for controlling of...
The instalation is regarding a switcgear box for controlling a diesel generator 500kW 3x400V at 50Hz, with have two sections, one section for main current and one section for controlling of machinery. The first section have busbars, main circuit breaker and power measuring printed board and the...
Hello to everybady
I've a project regarding instalation of switcgears in high altitudse up to 4000m.
The instalation is regarding a switcgear box for controlling a diesel generator 500kW 3x400V at 50Hz, with have two sections, one section for main current and one section for controlling of...
Hello to everybady
I've a project regarding instalation of switcgears in high altitudse up to 4000m.
I'm not familiar of the new demands and I'd like have assistance about it.
So I'm interesting for IEC standards, recommentations or other info, to enable me start up and manage in the write...