Hello,
I am having three 480V outlets installed but due to power limitations only one of these outlets can be used at a time. Can anyone give me any suggestions on how to ensure that we use only one at a time? Thank you!
Howdy,
Just found out that one tool we need in the shop will require 100 amps while the welder only requires 60A. If we wire all three 480v outlets to handle 100A then is it correct to assume the welder will be fine on these outlets as well? Thanks.
I am looking to find what electrical codes to follow when installing electrical wires/outlets etc. in a warehouse building. Not sure if normally the NEC book is followed but I can only find codes associated with residential structures. Any suggestions? Thanks.