Yes I'm sure the metering is on the primary of the transformer. The power company rep verified this and their spec clearly states so. Also, the spec clearly states the secondary is the delivery point. Section 240 and section 250 appear to require the service conductor to be rated for the...
Sorry I did not give enough details. Let me add some more. The Utility will have pole mounted fuses with an underground 300 foot feed to the pad mounted delta-wye transformer primary. The transformer secondary would be fed underground to the building where conduit will go up the outside wall and...
This is a 13.8KV:480 2000KVA pad mounted transformer with a primary fuse protected by pole mounted 65 amp fuses.
I usually feed to a panel board or a LV switch gear (depending on ratings) from the secondary of the transformer. I would like to feed two 1200 amp MCC. Therefore I would normally...